Industrial Waterjet Cleaning
Hydro Jetting • Hydro Blasting • Hydro Demolition
Execute critical cleaning and surface prep faster—while reducing downtime, manpower load, and high-risk exposure.
Dezu supports adoption from demo to subcontracting, rental, purchase (with SLA), training, and ongoing service.
Built for shutdown windows and heavy-industry work.
What changes when Dezu runs the job
Shorter downtime windows
Restart operations sooner.
Reduced high-risk exposure
Less work at heights and unnecessary hazard.
Repeatable execution
Clean output with less rework.
Common applications
- • Surface preparation (rust / coatings)
- • Concrete removal
- • Industrial pipe cleaning
- • Tank / vessel cleaning
- • Shutdown / turnaround cleaning
Scope varies by site condition and required finish.
Start where you are. Scale when you're ready.
We support adoption across demo, execution, rental, ownership, and training.
Demo
See the technology on a real scope.
Subcontract
Dezu executes specialized work safely and fast.
Rent
Your team gets hands-on experience.
Purchase (with SLA)
Acquire with service support and performance assurance.
Train
Build internal capability and independence.
Support
Parts, servicing, and continued technical guidance.
Technology behind the work
Configured per access, finish requirement, and site constraints.
Hydro Jetting
NLB + StoneAge Tools

NLB Pump

StoneAge Automated Tools
Hydro Blasting
NLB + VertiDrive Robots

NLB Pumps

VertiDrive Crawler Robots
Hydro Demolition
NLB + Conjet Robots

NLB Pump

Conjet Hydrodemolition Robots
Dezu finished in 1 week what normally takes us a month—without risky work at heights.
— Maintenance Lead, Heavy Industry
Dezu finished a 2-month scope in 1 week—with a smaller crew and clean execution.
— Project Manager, Industrial Operations
Dezu helped us avoid major replacement costs by cleaning and restoring the asset instead of replacing components.
— Asset Owner, Industrial Site
How a Dezu job runs
- 1. Site assessment (access, risk, target finish)
- 2. Method + equipment plan (scope + timeline)
- 3. Execution (crew + controls + daily outputs)
- 4. Turnover + next-step recommendation
Ready to cut downtime?
Request a site assessment and we'll recommend the fastest safe approach.