Dezu Corporation has delivered industrial waterjet projects across the Philippines and the Pacific since 2018 — for petrochemical plants, nickel refineries, gold processing facilities, geothermal fields, power plants, railways, airports, and fuel terminals. International EPCs and construction joint ventures select Dezu as the specialized subcontractor for concrete removal, tank work, and high pressure cleaning that conventional methods cannot handle. Every project below is contract-verified delivered work. Some client names are withheld out of respect for our clients' confidentiality — full project records and client references are available in a meeting.

PCAB Contractor's License No. 56253PhilGEPS Platinum MemberDelivering since 2018

Featured case studies

Reactor Tank Descaling for Plant Decommissioning — HPAL Nickel Processing Plant (2026)

Five months removing mixed sulfide scale from a brick-lined reactor vessel — top-down, level by level — restoring its working volume and baffle plates without damaging the acid-resistant lining, so a decommissioning-stage HPAL plant could finish its remaining production years. Our largest single descaling engagement to date.

Robotic Hydro Demolition — Underground Railway Double-Cell Wall (2024)

Honeycombed concrete removed from a three-legged double-cell wall — 1.6 m thick legs, 1.2 m thick slabs, 14 m wide and 6 m long — with a Conjet robot. Dezu's flagship robotic scope, delivered for an international construction joint venture.

Hydro Cutting — Crude Oil Tank Door Sheet, Guam Fuel Terminal (2022)

Spark-free waterjet door-sheet cut on a crude oil storage tank being converted to ULSD service, supervising the terminal operator's first use of their NLB 40305D UHP pump and cold cutting crawler.

Hydro Jetting — Airport Terminal Drainage Restoration (2022)

A fully clogged drainage affecting a VIP area at a major airport terminal, cleared by hydro jetting under engagement by the airport's operator. Hydro jetting removes the deposit from the pipe wall instead of punching a hole through it — and as of 2026, Dezu has never been called back for the same problem.

Hydro Demolition — Shear Key Exposure on a Tilted Structure, Petrochemical Plant Expansion (2021)

Selective concrete removal exposing the shear key of a newly erected structure that tilted from ground settling, so it could be lifted and corrected — under an international EPC joint venture.

How much work has Dezu delivered?

More than 30 contract-verified engagements since 2018: six hydro demolition projects, a six-shutdown descaling program at an HPAL nickel refinery, four quarterly water blasting campaigns at a gold processing facility, an approximately 25-order automated cleaning program at a multinational chemical plant, and two international deliveries — Guam and US Navy vessels. Behind the contracting record sits an equipment-servicing history dating to 2010: hundreds of high pressure pump and parts orders, each backed by the team's own maintenance service.

What kinds of projects has Dezu delivered?

The register below spans hydro demolition, hydro cutting, hydro jetting, hydro blasting, tank services, equipment supply, operator training, and maintenance under SLA — one-off structural repairs through multi-year recurring programs.

YearProjectScope
2026Heat Exchanger Tube CleaningGeothermal Binary PlantAll 4,106 preheater and vaporizer tubes cleaned in a single pass and accepted ten days after Day 1 — water jetting ran as the shutdown's critical path, completed in about a third of the previous first-pass duration on the same equipment.
2026Emergency Brine Pipeline Descaling and Exchanger Re-CleanGeothermal Binary PlantEmergency mobilization within days of the plant's request after post-restart differential pressure: six brine pipeline sections descaled to 100%, and the exchangers re-cleaned — 2,908 vaporizer tubes to overall flow-test acceptance plus 1,126 preheater tubes — on dual shifts, ahead of the original seven-day baseline.
2026Hydro JettingSlurry Pipeline Restoration, Fiber Cement Board Manufacturing PlantAged cement scale that had defeated the plant's own 350-bar in-house cleaning removed from slurry pipelines across two 12-hour service shifts, planned flange opening and reinstatement included.
2024Robotic Hydro DemolitionUnderground Railway Double-Cell WallHoneycombing between pours removed with a Conjet robot from a double-cell wall with 1.6 m thick legs and 1.2 m thick slabs, for an international construction joint venture.
2024Hydro DemolitionDefective Pour Removal on Viaduct Pillars, North–South Commuter RailwayRemoval of bad pour on pillar tops connecting to viaducts — base and extension orders under two contractor chains on the NSCR program.
2022–2024Automated Cleaning ProgramMultinational Chemical PlantAround 25 recurring orders of automated cleaning using an NLB pump with a 3D nozzle on a telescopic lance — our longest-running industrial cleaning program.
2024Plant ServicesGeothermal Power Plant (2024)Plant services campaign at a geothermal power plant.
2023Equipment SupplyNLB Pump System and StoneAge Automated Pipe Cleaning System, Gold MineTwo-system supply to a gold mining operation: ultra high pressure waterjet pump plus automated pipe cleaning, with service and training behind the sale.
2023Hydro BlastingProcessing Facility, Gold-Molybdenum MineWater blasting services at a second gold-mining client's processing facility.
2026Waterjet Pump MRO under Service Level Agreement (ongoing)First standing SLA engagement — maintenance and repair of a client's waterjet pump under contract, not per-incident.
2026Operator TrainingHydro Jetting Basic, HPAL Nickel RefineryCrew training delivered at the same facility that runs our recurring shutdown program.
2023–2026Shutdown Cleaning ProgramHPAL Nickel RefineryHigh pressure cleaning at every minor (March) and major (September) shutdown since the 2023 major shutdown — six shutdowns delivered to date, retained because Dezu descales equipment others cannot.
2026Reactor Tank Descaling for Plant DecommissioningHPAL Nickel Processing PlantFive months (January–May 2026) removing mixed sulfide scale from a brick-lined reactor tank with hydro demolition equipment — working volume and baffle plates restored for the plant's remaining production years.
2024–2026Water Blasting CampaignsGold Processing FacilityFour campaigns across the processing facility, process lines to tanks, on a quarterly cadence since late 2025.
2023Hydro DemolitionBeam Honeycombing Repair, Railway DepotLevel-5 slab and beam honeycombing removed without damaging reinforcements, for a Japanese general contractor joint venture.
2023Hydro DemolitionTurbine Structure Reinforcement Exposure, Combined Cycle Power PlantReinforcement exposure on turbine structures under an international engineering firm.
2023Autoclave DescalingHPAL Nickel Processing PlantHigh pressure descaling of an autoclave at a second HPAL facility — the same plant that brought Dezu back in 2026 for its decommissioning reactor tank descale.
2022Hydro CuttingCrude Oil Tank Door Sheet, GuamSupervised spark-free door-sheet cut on a tank converting to ULSD service, including the client's first use of their NLB 40305D UHP pump and cold cutting crawler.
2022Deck Anti-Skid RemovalUSNS Big Horn and USNS YukonWater blasting surface preparation removing anti-skid (ASA) coating from the decks of two US Navy vessels.
2022Hydro JettingAirport Terminal Drainage RestorationFully clogged drainage affecting a VIP area cleared by hydro jetting. Never called back for the same problem.
2022–2024Floating Roof Seal ReplacementThree Naphtha Tanks, Petrochemical PlantExternal floating roof seal systems repaired and replaced on three naphtha storage tanks, delivered as three separate engagements for the same client.
2022Operator TrainingGold Processing FacilityWaterjet operator training delivered for the pump the client purchased from Dezu.
2021Hydro DemolitionShear Key Exposure, Petrochemical Plant ExpansionConcrete connecting a tilted concrete-to-steel structure removed to expose the shear key for lifting and correction, under an international EPC joint venture.
2020Pipe Internals CleaningGeothermal FacilityInternal cleaning of geothermal pipework, documented with before-and-after bore photos.

Does Dezu handle recurring shutdown programs?

Yes. Dezu has cleaned every minor and major shutdown at an HPAL nickel refinery since its 2023 major shutdown — six shutdowns delivered to date — and runs quarterly water blasting campaigns at a gold processing facility. Plants keep Dezu on the shutdown calendar because our crews descale the equipment that defeats conventional methods or consumes the plant's own resources.

Planning a shutdown or a structural repair?

Tell us the asset, the problem, and your window. We reply with a method recommendation and a scope-based quotation.